power lline

NV Energy to replace 60-year-old transmission line to Tramway Drive

NV Energy is proposing to replace the electrical transmission line that runs from Foothill Rad in the Carson Valley to Tramway Drive near Heavenly Mountain Resort, and a public comment period has been initiated.

The U.S. Forest Service Lake Tahoe Basin Management Unit is seeking public input on 634 Line Rebuild project. The draft Environmental Assessment (EA) analyzes the proposed replacement of the transmission line that serves the Kingsbury substation, which provides electricity to Heavenly Mountain Resort and the surrounding Kingsbury Grade area.

Syndicate content