Hwy 89 road construction by Fanny Bridge may cause delays
Submitted by paula on Mon, 02/08/2016 - 8:48pm
The California Department of Transportation (Caltrans) will be performing grinding and paving work on sections of State Highway 89 in the Tahoe City area the next three days.
The work will take place from Blackwood Creek Road to and including the Truckee River (“Fanny”) Bridge in Tahoe City. It’s scheduled from 8 a.m. to 3:30 p.m. Tuesday through Thursday, Feb. 9-11 and will require one-way traffic control.
A number of potholes have developed on the highway because of the heavy amount of precipitation so far this winter, necessitating this repair work prior to a construction project resuming this spring that will rebuild the highway.
According to Caltrans, expect crews to be working on roads on the south shore soon, now that there is a dry spell, giving them optimum conditions to complete the work.
- cal trans
- california
- california department of transportation
- Caltrans
- city
- conditions
- construction
- department
- department of transportation
- fanny bridge
- Giving
- highway
- highway 89
- hwy 89
- News
- north lake tahoe
- potholes
- river
- road
- road construction
- roads
- south lake tahoe
- south shore
- spring
- state
- Tahoe
- tahoe city
- tahoe roads
- Traffic
- transportation
- Truckee
- truckee river
- winter
- work
Related Stories
- Lake Tahoe area roadwork October 28 - November 3
- Lake Tahoe area roadwork December 17 - 23
- Lake Tahoe area roadwork December 10 - 16
- Lake Tahoe area roadwork for October 29 - November 3
- Lake Tahoe, Sierra and El Dorado County roadwork October 25 - 31
- Lake Tahoe area roadwork December 3-9, 2017
- Lake Tahoe area roadwork for November 26 - December 2
- Lake Tahoe area roadwork for November 19-25